See 'postfix.jpg' for fixture holding 56 parts. I made 2 so 1 can be unloaded/reloaded while other is in machine. Operation mills length, spot, drill, tap deep 1/4-20 (they have all these leftover screws), and fly tool to break edge. Something less than 1